Bridge Repair Bridge Enabling Works
Hikuwai Bridge Repair - SH35
Project Overview
There are 4 bridges that cross the Hikuwai River on SH35. During Cyclone Gabrielle, Bridge #1 collapsed due to the force of slash build-up on the piles in the river. Parata was engaged to carry out the enabling works as Stage 1 of the bridge rebuild, preparing the site and establishing the foundations for full reconstruction. This critical infrastructure project restored a key crossing point for East Coast communities reliant on SH35 for access and connectivity.
Scope of Work
- Bridge enabling works (Stage 1)
- Site preparation and clearing
- Foundation establishment
- Cyclone Gabrielle recovery
- River crossing restoration
Project Details
- Client
- Transport Rebuild East Coast (TREC)
- Location
- Hikuwai River
- Year
- 2024
- Category
- Bridge Repair
- Type
- Bridge Enabling Works
Key Figures
Bridges on Hikuwai
4
Stage
1 - Enabling
Alliance
TREC