Hikuwai Bridge Repair - SH35
Bridge Repair Bridge Enabling Works

Hikuwai Bridge Repair - SH35

There are 4 bridges that cross the Hikuwai River on SH35. During Cyclone Gabrielle, Bridge #1 collapsed due to the force of slash build-up on the piles in the river. Parata was engaged to carry out the enabling works as Stage 1 of the bridge rebuild, preparing the site and establishing the foundations for full reconstruction. This critical infrastructure project restored a key crossing point for East Coast communities reliant on SH35 for access and connectivity.

  • Bridge enabling works (Stage 1)
  • Site preparation and clearing
  • Foundation establishment
  • Cyclone Gabrielle recovery
  • River crossing restoration

Project Details

Client
Transport Rebuild East Coast (TREC)
Location
Hikuwai River
Year
2024
Category
Bridge Repair
Type
Bridge Enabling Works

Key Figures

Bridges on Hikuwai
4
Stage
1 - Enabling
Alliance
TREC